This PR adds all the guides from [Visual Guides](https://bytebytego.com/guides/) section on bytebytego to the repository with proper links. - [x] Markdown files for guides and categories are placed inside `data/guides` and `data/categories` - [x] Guide links in readme are auto-generated using `scripts/readme.ts`. Everytime you run the script `npm run update-readme`, it reads the categories and guides from the above mentioned folders, generate production links for guides and categories and populate the table of content in the readme. This ensures that any future guides and categories will automatically get added to the readme. - [x] Sorting inside the readme matches the actual category and guides sorting on production
1.6 KiB
title, description, image, createdAt, draft, categories, tags
| title | description | image | createdAt | draft | categories | tags | |||
|---|---|---|---|---|---|---|---|---|---|
| How do Companies Ship Code to Production? | Explore the process companies use to ship code to production efficiently. | https://assets.bytebytego.com/diagrams/0334-ship-to-prod.png | 2024-03-15 | false |
|
|
The diagram below illustrates the typical workflow.
Step 1: The process starts with a product owner creating user stories based on requirements.
Step 2: The dev team picks up the user stories from the backlog and puts them into a sprint for a two-week dev cycle.
Step 3: The developers commit source code into the code repository Git.
Step 4: A build is triggered in Jenkins. The source code must pass unit tests, code coverage threshold, and gates in SonarQube.
Step 5: Once the build is successful, the build is stored in artifactory. Then the build is deployed into the dev environment.
Step 6: There might be multiple dev teams working on different features. The features need to be tested independently, so they are deployed to QA1 and QA2.
Step 7: The QA team picks up the new QA environments and performs QA testing, regression testing, and performance testing.
Step 8: Once the QA builds pass the QA team’s verification, they are deployed to the UAT environment.
Step 9: If the UAT testing is successful, the builds become release candidates and will be deployed to the production environment on schedule.
Step 10: SRE (Site Reliability Engineering) team is responsible for prod monitoring.