Task breakdown by user story: - US1 Load XER File (P1): 17 tasks - US2 Query Activities (P1): 10 tasks - US3 Query Relationships (P2): 9 tasks - US4 Query Summary (P3): 9 tasks TDD mandated: test tasks precede implementation tasks. Parallel opportunities identified for models, table handlers, and concurrent user story development after US1.
12 KiB
Tasks: Project Schedule Tools
Input: Design documents from /specs/001-schedule-tools/
Prerequisites: plan.md, spec.md, research.md, data-model.md, contracts/
Tests: TDD is mandated by constitution - tests MUST be written and fail before implementation.
Organization: Tasks are grouped by user story to enable independent implementation and testing.
Format: [ID] [P?] [Story] Description
- [P]: Can run in parallel (different files, no dependencies)
- [Story]: Which user story this task belongs to (US1, US2, US3, US4)
- Include exact file paths in descriptions
Path Conventions
- Source:
src/xer_mcp/ - Tests:
tests/ - Config:
pyproject.toml
Phase 1: Setup (Shared Infrastructure)
Purpose: Project initialization and basic structure
- T001 Create project directory structure per plan.md in src/xer_mcp/
- T002 Initialize Python project with uv and create pyproject.toml with dependencies (mcp, pytest, pytest-asyncio, ruff)
- T003 [P] Configure ruff for linting and formatting in pyproject.toml
- T004 [P] Create src/xer_mcp/init.py with version 0.1.0
- T005 [P] Create tests/conftest.py with sample XER file fixtures
Phase 2: Foundational (Blocking Prerequisites)
Purpose: Core infrastructure that MUST be complete before ANY user story can be implemented
⚠️ CRITICAL: No user story work can begin until this phase is complete
- T006 Create data models in src/xer_mcp/models/init.py (export all models)
- T007 [P] Create Project dataclass in src/xer_mcp/models/project.py
- T008 [P] Create Activity dataclass in src/xer_mcp/models/activity.py
- T009 [P] Create Relationship dataclass in src/xer_mcp/models/relationship.py
- T010 [P] Create PaginationMetadata dataclass in src/xer_mcp/models/pagination.py
- T011 Create SQLite schema in src/xer_mcp/db/schema.py with all tables and indexes
- T012 Create database connection manager in src/xer_mcp/db/init.py
- T013 Create MCP server skeleton in src/xer_mcp/server.py with stdio transport
- T014 Create base table handler abstract class in src/xer_mcp/parser/table_handlers/base.py
- T015 Create error types and NO_FILE_LOADED error in src/xer_mcp/errors.py
Checkpoint: Foundation ready - user story implementation can now begin
Phase 3: User Story 1 - Load XER File (Priority: P1) 🎯 MVP
Goal: Parse XER files and load schedule data into SQLite database
Independent Test: Load a sample XER file and verify projects, activities, relationships are stored in SQLite
Tests for User Story 1
NOTE: Write these tests FIRST, ensure they FAIL before implementation
- T016 [P] [US1] Contract test for load_xer tool in tests/contract/test_load_xer.py
- T017 [P] [US1] Integration test for XER parsing in tests/integration/test_xer_parsing.py
- T018 [P] [US1] Integration test for multi-project handling in tests/integration/test_multi_project.py
- T019 [P] [US1] Unit test for XER parser in tests/unit/test_parser.py
- T020 [P] [US1] Unit test for table handlers in tests/unit/test_table_handlers.py
Implementation for User Story 1
- T021 [US1] Create XER parser main class in src/xer_mcp/parser/xer_parser.py
- T022 [P] [US1] Create PROJECT table handler in src/xer_mcp/parser/table_handlers/project.py
- T023 [P] [US1] Create TASK table handler in src/xer_mcp/parser/table_handlers/task.py
- T024 [P] [US1] Create TASKPRED table handler in src/xer_mcp/parser/table_handlers/taskpred.py
- T025 [P] [US1] Create PROJWBS table handler in src/xer_mcp/parser/table_handlers/projwbs.py
- T026 [P] [US1] Create CALENDAR table handler in src/xer_mcp/parser/table_handlers/calendar.py
- T027 [US1] Create table handler registry in src/xer_mcp/parser/table_handlers/init.py
- T028 [US1] Create database loader in src/xer_mcp/db/loader.py to insert parsed data into SQLite
- T029 [US1] Implement load_xer MCP tool in src/xer_mcp/tools/load_xer.py
- T030 [US1] Register load_xer tool in src/xer_mcp/server.py
- T031 [US1] Add file-not-found and parse-error handling in src/xer_mcp/tools/load_xer.py
- T032 [US1] Add multi-project detection and selection logic in src/xer_mcp/tools/load_xer.py
Checkpoint: User Story 1 complete - XER files can be loaded and parsed
Phase 4: User Story 2 - Query Project Activities (Priority: P1)
Goal: List and filter activities, get activity details with pagination
Independent Test: Load XER file, query activities with filters, verify pagination metadata
Tests for User Story 2
NOTE: Write these tests FIRST, ensure they FAIL before implementation
- T033 [P] [US2] Contract test for list_activities tool in tests/contract/test_list_activities.py
- T034 [P] [US2] Contract test for get_activity tool in tests/contract/test_get_activity.py
- T035 [P] [US2] Unit test for activity queries in tests/unit/test_db_queries.py
Implementation for User Story 2
- T036 [US2] Create activity query functions with pagination in src/xer_mcp/db/queries.py
- T037 [US2] Implement list_activities MCP tool in src/xer_mcp/tools/list_activities.py
- T038 [US2] Implement get_activity MCP tool in src/xer_mcp/tools/get_activity.py
- T039 [US2] Register list_activities and get_activity tools in src/xer_mcp/server.py
- T040 [US2] Add NO_FILE_LOADED error check to activity tools in src/xer_mcp/tools/list_activities.py
- T041 [US2] Add date range filtering to list_activities in src/xer_mcp/tools/list_activities.py
- T042 [US2] Add WBS and activity_type filtering to list_activities in src/xer_mcp/tools/list_activities.py
Checkpoint: User Stories 1 AND 2 complete - activities are queryable
Phase 5: User Story 3 - Query Activity Relationships (Priority: P2)
Goal: Query predecessors, successors, and full relationship network
Independent Test: Load XER file, query relationships for an activity, verify types and lags
Tests for User Story 3
NOTE: Write these tests FIRST, ensure they FAIL before implementation
- T043 [P] [US3] Contract test for list_relationships tool in tests/contract/test_list_relationships.py
- T044 [P] [US3] Contract test for get_predecessors tool in tests/contract/test_get_predecessors.py
- T045 [P] [US3] Contract test for get_successors tool in tests/contract/test_get_successors.py
Implementation for User Story 3
- T046 [US3] Create relationship query functions in src/xer_mcp/db/queries.py
- T047 [US3] Implement list_relationships MCP tool in src/xer_mcp/tools/list_relationships.py
- T048 [US3] Implement get_predecessors MCP tool in src/xer_mcp/tools/get_predecessors.py
- T049 [US3] Implement get_successors MCP tool in src/xer_mcp/tools/get_successors.py
- T050 [US3] Register relationship tools in src/xer_mcp/server.py
- T051 [US3] Add NO_FILE_LOADED error check to relationship tools
Checkpoint: User Stories 1, 2, AND 3 complete - relationships are queryable
Phase 6: User Story 4 - Query Project Summary (Priority: P3)
Goal: Get project overview, milestones, and critical path activities
Independent Test: Load XER file, get summary, list milestones, get critical path
Tests for User Story 4
NOTE: Write these tests FIRST, ensure they FAIL before implementation
- T052 [P] [US4] Contract test for get_project_summary tool in tests/contract/test_get_project_summary.py
- T053 [P] [US4] Contract test for list_milestones tool in tests/contract/test_list_milestones.py
- T054 [P] [US4] Contract test for get_critical_path tool in tests/contract/test_get_critical_path.py
Implementation for User Story 4
- T055 [US4] Create summary query functions in src/xer_mcp/db/queries.py
- T056 [US4] Implement get_project_summary MCP tool in src/xer_mcp/tools/get_project_summary.py
- T057 [US4] Implement list_milestones MCP tool in src/xer_mcp/tools/list_milestones.py
- T058 [US4] Implement get_critical_path MCP tool in src/xer_mcp/tools/get_critical_path.py
- T059 [US4] Register summary tools in src/xer_mcp/server.py
- T060 [US4] Add NO_FILE_LOADED error check to summary tools
Checkpoint: All user stories complete - full MCP server functional
Phase 7: Polish & Cross-Cutting Concerns
Purpose: Improvements that affect multiple user stories
- T061 [P] Integration test for edge cases in tests/integration/test_edge_cases.py
- T062 [P] Unit test for models in tests/unit/test_models.py
- T063 Add logging throughout src/xer_mcp/ modules
- T064 Run quickstart.md validation - test all documented examples
- T065 Add main.py entry point in src/xer_mcp/main.py
- T066 Final type checking with mypy and fix any issues
- T067 Run ruff format and fix any linting issues
Dependencies & Execution Order
Phase Dependencies
- Setup (Phase 1): No dependencies - can start immediately
- Foundational (Phase 2): Depends on Setup completion - BLOCKS all user stories
- User Story 1 (Phase 3): Depends on Foundational - BLOCKS US2, US3, US4 (they need load_xer)
- User Story 2 (Phase 4): Depends on US1 (needs loaded data to query)
- User Story 3 (Phase 5): Depends on US1 (needs loaded data to query)
- User Story 4 (Phase 6): Depends on US1 (needs loaded data to query)
- Polish (Phase 7): Depends on all user stories being complete
User Story Dependencies
- US1 (Load XER): Foundation for all others - MUST complete first
- US2 (Activities): Can start after US1 - independent of US3, US4
- US3 (Relationships): Can start after US1 - independent of US2, US4
- US4 (Summary): Can start after US1 - independent of US2, US3
Within Each User Story
- Tests MUST be written and FAIL before implementation
- Models before services/queries
- Queries before MCP tools
- Core implementation before error handling
- Register tools in server.py after implementation
Parallel Opportunities
Phase 2 (Foundational):
# These can run in parallel:
Task T007: "Create Project dataclass"
Task T008: "Create Activity dataclass"
Task T009: "Create Relationship dataclass"
Task T010: "Create PaginationMetadata dataclass"
Phase 3 (US1 - Table Handlers):
# These can run in parallel:
Task T022: "Create PROJECT table handler"
Task T023: "Create TASK table handler"
Task T024: "Create TASKPRED table handler"
Task T025: "Create PROJWBS table handler"
Task T026: "Create CALENDAR table handler"
After US1 Complete (US2, US3, US4 can start in parallel):
# Developer A: User Story 2 (Activities)
# Developer B: User Story 3 (Relationships)
# Developer C: User Story 4 (Summary)
Implementation Strategy
MVP First (User Story 1 + 2)
- Complete Phase 1: Setup
- Complete Phase 2: Foundational
- Complete Phase 3: User Story 1 (Load XER)
- STOP and VALIDATE: Can load XER files successfully
- Complete Phase 4: User Story 2 (Activities)
- MVP COMPLETE: Can load XER and query activities
Incremental Delivery
- Setup + Foundational → Project ready
- User Story 1 → XER files load → Demo loading
- User Story 2 → Activities queryable → Demo activity queries
- User Story 3 → Relationships queryable → Demo dependency analysis
- User Story 4 → Summary available → Demo project overview
- Polish → Production ready
Parallel Team Strategy
With multiple developers after US1:
- Developer A: User Story 2 (list_activities, get_activity)
- Developer B: User Story 3 (relationships, predecessors, successors)
- Developer C: User Story 4 (summary, milestones, critical_path)
Notes
- [P] tasks = different files, no dependencies on incomplete tasks
- [Story] label maps task to specific user story for traceability
- Constitution mandates TDD: write tests first, verify they fail, then implement
- Commit after each task or logical group
- Stop at any checkpoint to validate story independently
- All query tools must check for NO_FILE_LOADED condition